All Projects

72MWp IN AHILYANAGAR Solar Utility

72MWp IN AHILYANAGAR

Ahilyanagar, Maharashtra

Prestigious EPC project of MAHAGENCO under the PM KUSUM scheme. Developed and executed by Continual with successful commissioning within the stipulated timeline.

  • EPC Execution
  • Project Management
  • Timely Delivery & Quality
Commissioned: Dec 2024
60MWp IN BHANDARA Solar Utility

60MWp IN BHANDARA

Bhandara, Maharashtra

Prestigious IPP project of Continual under the PM KUSUM scheme, developed and executed with precision and planned to be commissioned by Nov 2026.

  • Utility Scale Solar
  • Engineered for Excellence
  • On-Time Commissioning
Planned commissioning: Nov 2026
118MWp IN NASIK & SANGLI Solar Utility

118MWp IN NASIK & SANGLI

Nasik & Sangli, Maharashtra

Prestigious IPP projects of JMR Infra under the PM KUSUM scheme, under development and planned to be commissioned by Dec 2026.

  • Large Scale Development
  • Sustainable by Design
  • Timely Execution
Planned commissioning: Dec 2026
64.20MWp IN TN & MH Solar Utility

64.20MWp IN TN & MH

Tamil Nadu & Maharashtra

Prestigious EPC project of CLEAN TECH SOLAR under development in Tamil Nadu and Maharashtra and planned to be commissioned by Jun 2026.

  • Multi-State Execution
  • Quality & Safety Focused
  • Scheduled Delivery
Planned commissioning: Jun 2026
SANJAY GHODAWAT UNIVERSITY Solar Rooftop

SANJAY GHODAWAT UNIVERSITY

Capacity: 1.2 MWp Kolhapur, Maharashtra

Sanjay Ghodawat University's 1.2 MW solar rooftop project, commissioned in 2020, combines rooftop and ground systems to cut emissions, boost energy independence, and demonstrate sustainable, future-focused campus development.

Commissioned: 2020
AMEYA LOGISTIC Solar Rooftop

AMEYA LOGISTIC

Capacity: 654 kWp Pune, Maharashtra

Ameya Logistics' 654 kWp solar plant, commissioned on March 6, 2025, uses PV-DG synchronization to prioritize solar during outages, reducing diesel use, costs, and ensuring uninterrupted operations across industrial operations.

Commissioned: Mar 06, 2025
PSA MUMBAI Solar Rooftop

PSA MUMBAI

Capacity: 1000 kWp Mumbai, Maharashtra

Commissioned on Feb 01, 2022, the 1000 kWp solar project at PSA Mumbai is a unique ground-mounted installation on reclaimed soil near the seashore, designed for captive power consumption. It exemplifies engineering excellence and leadership in driving India's clean energy transition.

Commissioned: Feb 01, 2022
BIRLA RICE MILL Solar Rooftop

BIRLA RICE MILL

Capacity: 333 kWp Ichalkaranji, Maharashtra

Commissioned August 2020, Birla Rice Mill's 333 kW solar plant in Ichalkaranji overcomes a steep dome roof using module optimizers, maximizing generation, safety and structural integrity across challenging industrial conditions.

Commissioned: Aug 2020
65 MW SOLAR PARK AT CHANDRAPUR Electrical Infrastructure

65 MW SOLAR PARK AT CHANDRAPUR

Capacity: 65 MW Chandrapur, Maharashtra

BVG India's 65 MW Chandrapur project delivers a complete sun-to-grid solution, integrating solar generation, 33/220 kV pooling substation, advanced control rooms and a dedicated 220 kV transmission line.

Key scope: 33/220 kV Pooling Substation & 220 kV Transmission Line
80 MW SOLAR PARK AT ARVI, WARDHA Electrical Infrastructure

80 MW SOLAR PARK AT ARVI, WARDHA

Capacity: 80 MW Arvi, Wardha, Maharashtra

Hero Future Energy's Arvi project supports an 80 MW solar park through a 132/33 kV pooling substation and dedicated transmission line, ensuring stable, efficient evacuation to the state grid.

Key scope: 132/33 kV Pooling Substation & Transmission Line
350 MW WIND POWER PLANT AT WASHI Electrical Infrastructure

350 MW WIND POWER PLANT AT WASHI

Capacity: 350 MW Washi, Maharashtra

Serentica's 350 MW Kallam Wind project connects 105 turbine locations via a 220 kV pooling substation and transmission line, enabling reliable turbine-to-grid power delivery for industrial consumers.

Key scope: 220 kV Pooling Substation & Transmission Line
13 KM OF 132kV LINE WITH LAND AT GHATANJI Electrical Infrastructure

13 KM OF 132kV LINE WITH LAND AT GHATANJI

Ghatanji, Maharashtra

Completed in 2026, CleanMax's Ghatanji project involved constructing a 13 km, 132 kV transmission line, overcoming complex right-of-way challenges to deliver a safe, high-voltage link for renewable power evacuation.

Line length: 13 km Voltage: 132 kV Completed: 2026
WINDMILL FOUNDATIONS Civil Infrastructure

WINDMILL FOUNDATIONS

Continual delivers high-strength wind turbine foundations, managing complex excavation and precision concreting with strict thermal monitoring, ensuring zero-defect structural integrity and monolithic support for utility-scale turbines.

  • High Strength Concrete
  • Thermal Monitoring
  • Precision Execution
  • Monolithic Support
SOLAR MMS FOUNDATIONS Civil Infrastructure

SOLAR MMS FOUNDATIONS

Continual executes rapid, precise MMS pile foundations for large solar parks, ensuring strict alignment, soil adaptation, and stable support for fixed-tilt and tracker systems across vast project sites.

  • Precision Alignment
  • Soil Adaptive Design
  • Fast Execution
  • Stable Support for MMS
MAIN CONTROL ROOM FOR POWER PLANTS Civil Infrastructure

MAIN CONTROL ROOM FOR POWER PLANTS

Continual delivers turnkey main control rooms built for power plants with robust structures, integrated HVAC, ergonomic layouts, cable trays, fire safety systems, and secure access for 24x7 reliable asset monitoring.

  • Integrated HVAC
  • Fire Safety Systems
  • Ergonomic Layout
  • 24x7 Asset Monitoring
ELECTRICAL EQUIPMENT FOUNDATIONS Civil Infrastructure

ELECTRICAL EQUIPMENT FOUNDATIONS

Continual delivers heavy-duty civil works for electrical equipment foundations, including precise infrastructure for transformers, switchyards, and foundation trenches, ensuring safe, reliable power evacuation.

  • Transformer Foundations
  • Switchyard Works
  • Foundation Trenches
  • Reliable Power Evacuation